An upgrade to the wastewater treatment capacity was needed as a result of the redevelopment of a former Haystack Mountain ski resort in Wilmington, Vermont.  Schultz was selected to expand twin aerated settling lagoons and the installation of a 100,000 gallon steel ground mounted water tank.  The expansion of lagoons including a new liner system, installation of a new aeration system, a new aeration building, associated aeration equipment and piping, and integration of all electrical systems.

Location: Wilmington, VT