• 2014-10-27-13.33.32
  • 2015-05-21-11.23.54-1
  • 2015-05-21-11.24.39
  • 2015-05-21-11.26.04
  • 2015-05-21-11.38.17
  • Wilmington-1B
  • Wilmington-Aeration-Lagoons

An upgrade to the wastewater treatment capacity was needed as a result of the redevelopment of a former Haystack Mountain ski resort in Wilmington, Vermont.  Schultz was selected to expand twin aerated settling lagoons and the installation of a 100,000 gallon steel ground mounted water tank.  The expansion of lagoons including a new liner system, installation of a new aeration system, a new aeration building, associated aeration equipment and piping, and integration of all electrical systems.

Location: Wilmington, VT