Gloversville Mayor Dayton King joined Schultz Construction on Friday, 9/15/2017, at 8:00AM to officially turn off the sanitary sewer bypass pumps which officially means the newly installed sewer pipe is online. Schultz was selected to perform this emergency trunk sewer line repair which consisted of replacing 1,265 linear feet of vitrified clay tile pipe with 30-inch PVC and DIP piping and the installation of nine(9) new manholes. The sewer line crossed the Cayadutta Creek in three locations which posed a unique shoring and dewatering challenge in which Schultz was able to successfully overcome. We are proud to have been contracted by the City of Gloversville for the emergency trunk sewer line repair and glad to have remedied this situation for the effected community!